Progress of stainless steel smelting technology in hot metal
China's scrap steel, especially the accumulation of stainless steel scrap is very small, therefore, the development of all or part of the molten iron smelting stainless steel is the goal of China's stainless steel factory, there are 3 factories in the world with molten steel smelting stainless steel. In 2003, China TISCO built a three-step production process with hot metal as the main raw material, that is, hot metal pretreatment, desiliconization and dephosphorization -30tUHP electric furnace prefusion -75tK-OBM-S double-blown converter decarburization -80tVOD refining - 80tLF furnace refining - vertical bending square slab continuous casting machine. The key equipment of hot metal pretreatment is imported from Japan JFE Group Kawasaki, 75tK-B0M-S converter is imported from Voestropf, 80tVOD is imported from Danieli, and the design output of this production line is 55t of stainless steel.
The converter smelting stainless steel has the following characteristics:
(1) Flexible raw materials, both can be used EAF pre-fused alloy (15-30t) + part of dephosphorized hot metal (30-50t), can also be all dephosphorized hot metal (65t) smelting stainless steel;
(2) The converter furnace capacity is large, which can ensure smooth operation without spatter;
(3) The top gun with gun position control can obtain high decarbonization speed and CO after blowing operation to ensure the heat energy needs in smelting operation;
(4) The cooling gas flow and pressure of the bottom tuyere can be controlled separately to ensure optimal cooling and extend the service life of the tuyere;
(5) Adopt VAI-CON-TEMP continuous temperature measuring device;
(6) Pneumatic slag stopper and IRIS slag measuring system are used to reduce excessive slag amount during steel production to ensure the VOD operation of the next process;
(7) Advanced LevelII automatic control system and software model are adopted to ensure the automatic control of stainless steel smelting in the converter and improve the quality of stainless steel.
Mastering the stainless steel process of K-OBM-S converter has achieved the following results:
(1) The original design output of K-OBIII-S was 350,000 t/a, and since it was put into operation in April 2003, 260,500 t of stainless steel was produced that year, and K-OBNI-S converter shell replacement car was installed in 2004, which shortened the furnace shell replacement time. After completion of the transformation, the design output of stainless steel is 550,000 t/a.
(2) The life of the furnace lining has been continuously improved, from about 200 times at the beginning to nearly 700 times at present, and the life of the furnace bottom has also been continuously improved, from 50 times at the beginning to nearly 300 times at present (each furnace lining replaces the bottom 2-3 times).
(3) Hydrogen discharge consumption is greatly reduced, the original design of smelting 304 stainless steel hydrogen consumption is 8m3/t, and now N2 replaces Ar in the whole process of the bottom tuyere, achieving obvious economic benefits.
(4) Cancel the furnace melting alloy process, the implementation of 100% dephosphorized hot metal, chrome iron all added to the converter smelting 400 series stainless steel two-step production process, greatly reducing production costs.